7.4 KW On-Grid solar system installed at Rawalpindi, Cantt
The hardworking, and proficient team at Enabling Solutions finished a 7.4 kW on-grid solar system installation at Rawalpindi, Cantt successfully.
Date:
Client:
Category:
Address:
Enabling Solutions' trained staff is extremely proud of their successful installation of the 10.2 kW solar system at Wapda Town, Lahore. This 10.2 kW solar system shows our skills in providing creative and sustainable solar solutions that are suited to the energy requirements of residential and commercial organizations.
The hardworking, and proficient team at Enabling Solutions finished a 7.4 kW on-grid solar system installation at Rawalpindi, Cantt successfully.
Enabling Solutions’ dedicated skilled crew have successfully finished a 15-kW on-grid solar system installation project in I-8 in Islamabad.
The hardworking, knowledgeable, and proficient staff at Enabling Solutions finished a 16.6 kW on-grid solar system installation at F-11, Islamabad successfully.
Islamabad Office: Office 1st Floor, Plot No 206, Services Road East, Sector I-10/3, Islamabad.
Lahore Office: .Office 19, Main Boulevard, Military Accounts Society, College Road, Lahore
Copyright © 2024 Enabling Solutions | All rights reserved.