50.1 KW On-Grid solar system installed Kallar Kahar Marriage Hall
Enabling Solutions’ skilled crew successfully finished a 50.1-kW project in Kallar Kahar Marriage Hall.
53.58 Kw On-Grid Solar System Installed at al-Noor Dairy farm, Kallar Kahar
Our professional and dedicated team at Enabling Solutions takes immense pride in successfully installing the 53.58 Kw On-Grid Solar System at al-Noor Dairy farm, Kallar Kahar.
180 Kw On-Grid Solar System Installed at Kallar Kahar Science College
Our professional and dedicated team at Enabling Solutions takes immense pride in successfully installing the 180 kW On-Grid Solar System installed at Kallar Kahar Science College.
29.7kW On-Grid Solar Project Completed at Wajahat Surgical Hospital, Attock
Our experienced and dedicated team at Enabling Solutions takes immense pride in successfully installing the 29.7kW Wajahat Surgical Hospital, Attock.
.
20 kW On-Grid Solar Project Completed in Shah Town, Toker Naiz Baig, Lahore
Our expert and dedicated team at Enabling Solutions takes immense pride in successfully installing the20 kW On-Grid Solar Project Completed inAlawan Sweet, Shah Town, Toker Naiz Baig, Lahore.
55.5 kW On-Grid Solar Project Completed in Muslim Flour Mill, Chiniot
Our experienced dedicated team at Enabling Solutions takes immense pride in successfully installing the 55.500kW On Grid Project in the vibrant neighborhood of Muslim Flour Mill, Chiniot.