10.2 KW On-Grid solar system installed at Multan Road, Lahore

Date:

Client:

07/02/2024
Multan Road, Lahore

Category:

Address:

Residential
Multan Road, Lahore
10.2 kw on grid solar system

Project Technical Details

  • Total Capacity: 10.2 kW kW
  • Solar Panels: Longi 570-Watt (18) Panels, Hi Mo6 Mono PERC Half Technology High-quality, state-of-the-art solar panels. kW
  • On-grid Inverter: Solis 10 kW Ongird, Inverter technology seamlessly manages solar energy and grid connectivity. kW
  • Monitoring System: Mobile App for Real-time Monitoring. kW
  • Monthly United Generation: 1200 Units. kW
  • Annual United Generation: 14400 Units. kW
  • Benefits of Project

    Enabling Solutions' workers successfully installed a 10 kW solar system at Multan Road, Lahore. Our 10 kW solar system showcases our capacity to offer renewable energy options to both residential and business customers.


    • Get Rid of Extensive Load shedding
    • ZERO Electricity Bill
    • 20-25 years system life

    Related Portfolio