About the project

  • Date: 12 February, 2024
  • Client: Gulraiz, Rawalpindi
  • Category:
  • Address: Gulraiz, Rawalpindi

Project Technical Details

  • Total Capacity: 10.1 kW
  • Solar Panels: Trina 590 N-type Bifacial x 17.
  • On-Grid Inverter: 10kW Growatt On-Grid Inverter.
  • Monitoring System: Mobile App for Real-time Monitoring.
  • Monthly United Generation:1200 Units.
  • Annual United Generation: 14400 Units.

Benefits of Project

Enabling Solutions’ employees successfully built a 10.1 kW solar system at Gulraiz, Rawalpindi. Our 10.1 kW solar system displays our ability to provide sustainable energy solutions for both residential and commercial customers.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life