Project Technical Details
- Total Capacity: 7.4 kW
- Solar Panels: Longi Hi Mo 6 575 x 13 panels.
- On-Grid Inverter: Nitrox 6kW SP.
- 𝐁𝐚𝐭𝐭𝐞𝐫𝐲: Dongjin 48V 100 Ah Lithium Ion Battery
- Monitoring System: Mobile App for Real-time Monitoring.
- Monthly United Generation: 897+ Units.
- Annual United Generation: 10760+ Units.
Benefits of Project
A 7.4 kW on-grid solar system was successfully installed at Peshawar, by our skillful and professional team members from Enabling Solutions. Our 7.4 kW solar system showcases our ability to provide sustainable energy solutions to both residential and commercial customers.