About the project

  • Date: 9 May, 2024
  • Client: I-8, Islamabad
  • Category:
  • Address: I-8, Islamabad

Project Technical Details

  • Total Capacity: 20 kW
  • Solar Panels: 34 x Trina Ntype Bifacial TopCON 595
  • On-Grid Inverter: SAJ R-6 20kW
  • Monitoring System: Mobile App for Real-time Monitoring.
  • Monthly United Generation:1200 Units.
  • Annual United Generation: 14400 Units.

Benefits of Project

The skilled team at Enabling Solutions have recently installed a 20 kW solar system at I-8 in Islamabad, demonstrating our capacity to provide sustainable energy solutions to both residential and commercial customers.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life