About the project

  • Date: 13 April 2024
  • Client: I-8, Islamabad
  • Category:
  • Address: I-8, Islamabad

Project Technical Details

  • Total Capacity: 15 kW
  • Solar Panels: 26 x Trina Ntype Bifacial TopCON 595W.
  • On-Grid Inverter: Growatt 15kW.
  • Monitoring System: Mobile App for Real-time Monitoring.
  • Monthly United Generation:1200 Units.
  • Annual United Generation: 14400 Units.

Benefits of Project

Enabling Solutions employees recently installed a 15-kW solar system at I-8 in Islamabad, demonstrating our capacity to provide sustainable energy solutions to both residential and business customers.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life