About the project

  • Date: 22 May, 2024
  • Client: Gulraiz, Islamabad
  • Category:
  • Address: Gulraiz, Islamabad

Project Technical Details

  • Total Capacity: 10 kW
  • Solar Panels: Trina 595W Ntype Bifacial TopCON x 17.
  • On-Grid Inverter: Invert Growatt 10kW
  • Monitoring System: Mobile App for Real-time Monitoring.
  • Monthly United Generation:1200 Units.
  • Annual United Generation: 14400 Units.

Benefits of Project

A 10.1 kW on-grid solar system was successfully installed at Gulraiz, Islamabad, by our skilled and professional team from Enabling Solutions. Our 10.1-kW solar system showcases our ability to provide sustainable energy solutions to both residential and commercial customers.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life
Complaintscreen tag