About the project

  • Date: May 20, 2023
  • Client: I-8/2, Islamabad
  • Category:
  • Address: I-8/2, Islamabad

Project Technical Details

  • Total Capacity: 10.53kW
  • Solar Panels: High-quality, state-of-the-art solar panels
  • Hybrid Inverter: Maxpower Suntronic 5Kw Inverter (2 No’s), Cutting-edge hybrid inverter technology seamlessly manages solar energy, battery storage, and grid connectivity.
  • Battery Storage: Narada Lithium ion 48V, 100Ah Batteries, Efficient storage system ensures reliable power supply even during grid outages.
  • Monitoring System: Advanced monitoring system provides real-time data on energy production, consumption, and performance of the solar system.
  • Monthly United Generation: 1,260 Units

Benefits of Project

Our team at Enabling Solutions takes immense pride in successfully installing the 10.35Kw Hybrid Solar System at I-8/2 Islamabad. This project showcases our expertise in delivering innovative and sustainable solar solutions tailored to meet the energy needs of residential and commercial properties.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life
Complaintscreen tag