10.35Kw Hybrid Solar System Installed at I-8/2 Islamabad

Date:

Client:

20/05/2024
I-8/2, Islamabad

Category:

Address:

Residential
I-8/2, Islamabad
10.35Kw Hybrid Solar System Installed at I-8/2 Islamabad

Project Technical Details

  • Total Capacity: 10.53kW kW
  • Solar Panels: High-quality, state-of-the-art solar panels kW
  • On-grid Inverter: Maxpower Suntronic 5Kw Inverter (2 No's), Cutting-edge hybrid inverter technology seamlessly manages solar energy, battery storage, and grid connectivity. kW
  • Monitoring System: Advanced Monitoring System Provides Real-time Data On Energy Production, Consumption, And Performance Of The Solar System. kW
  • Monthly United Generation: 1260 Units. kW
  • Annual United Generation: 14400 Units. kW
  • Benefits of Project

    Our team at Enabling Solutions takes immense pride in successfully installing the 10.35Kw Hybrid Solar System at I-8/2 Islamabad. This project showcases our expertise in delivering innovative and sustainable solar solutions tailored to meet the energy needs of residential and commercial properties.


    • Get Rid of Extensive Load shedding
    • ZERO Electricity Bill
    • 20-25 years system life

    Related Portfolio