Project Technical Details
- Total Capacity: 5.95 kW
- Project Completion Date: 19 May 2023
- Solar Panels:545 Watt Longi 11 Panels, Mono PERC Half Technology High-quality, state-of-the-art solar panels
- Hybrid Inverter: : Saj 10kW Ongird, Inverter technology seamlessly manages solar energy, and grid connectivity.
- Monitoring System: Advanced monitoring system provides real-time data on energy production, consumption, and performance of the solar system.
- Monthly United Generation: 720 Units
- Annual United Generation: 8,640 Units
Benefits of Project
Our dedicated team at Enabling Solutions takes immense pride in successfully installation of the 6 Kw On-Grid Solar Project in the Block D, Federation, Islamabad. This project showcases our expertise in delivering innovative and sustainable solar solutions tailored to meet the energy needs of residential and commercial properties.