About the project

  • Date: 01 June 2023
  • Client: G-9/1, Islamabad
  • Category:
  • Address: G-9/1, Islamabad

Project Technical Details

  • Total Capacity: 10 kW
  • Project Completion Date:01 June 2023
  • Solar Panels:570 Watt Longi 18 Panels, Mono PERC Half Technology High-quality, state-of-the-art solar panels
  • Hybrid Inverter: : Growatt 10ktl On Grid, inverter technology seamlessly manages solar energy, and grid connectivity.
  • Monitoring System: Advanced monitoring system provides real-time data on energy production, consumption, and performance of the solar system.
  • Monthly United Generation: 1,200 Units
  • Annual United Generation: 14,400 Units

Benefits of Project

Our expert team at Enabling Solutions takes immense pride in successfully installation of the 10 Kw On-Grid Solar Project in the G-9/1, Islamabad. This project showcases our expertise in delivering innovative and sustainable solar solutions tailored to meet the energy needs of residential and commercial properties.

  • Get Rid of Extensive Load shedding
  • ZERO Electricity Bill
  • 20-25 years system life